You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Scope

This page contains the Kmehrmessages for testing the visualisation of frequency combined with week.

Purpose

x

Instructions for EVS use

IMPORTANT: This test has to be performed using the new version of EVS.

Each test will contain this EVS export file that has to be uploaded using EVS-action REPLACE.

The EVS parameter writeAsIs must be set to false.


Description

After reading the scheme, the visualisation of the frequency can be verified in the SUT.


S22R10: Combined use of Frequency and Week

Preparation

  1. Start EVS with the following parameters: -generateDailyMedicationScheme=true -dailyMedicationSchemeDate="2030-06-10". The date can be changed to the required date.
    For more info about EVS parameters, see EVS_3.x.y_Manual#Parameterisation.1
  2. Upload the EVS export file using the EVS-action REPLACE with a patient of your choosing.
  3. Open the SUT and add a new medication to the scheme. The scheme should now have 3 lines.
  4. Generate a print without syncing to Vitalink.


Expected results

  • TS-1: The SUT and the EVS daily PDF should contain the same lines for monday 10/06/2030.
  • TS-2: The SUT and the EVS daily PDF should contain the same lines for tuesday 11/06/2030.
  • TS-3: The SUT and the EVS daily PDF should contain the same lines for wednesday 12/06/2030.
  • TS-4: The SUT and the EVS daily PDF should contain the same lines for thursday 13/06/2030.
  • TS-5: The SUT and the EVS daily PDF should contain the same lines for friday 14/06/2030.
  • TS-6: The SUT and the EVS daily PDF should contain the same lines for saturday 15/06/2030.
  • TS-7: The SUT and the EVS daily PDF should contain the same lines for sunday 16/06/2030.
  • No labels